Technology and roadmap

Built on the stack we already run

R first, Parquet and PostgreSQL storage, one job per source, and a Shiny dashboard published like the other NXW apps.

Technology

The stack

R first

Connectors and checks in R (httr2, data.table, arrow, DBI, validate); Python only where needed.

Storage

Parquet by table and date, queried with DuckDB; PostgreSQL for codes, sources and the quality log.

Scheduling

One job per source on a Linux server, then the daily build once every source is in.

Serving

IFRC SFTP folder, a plumber API, and the nxwdata R package used by every app.

Monitoring

A Shiny dashboard published like the other NXW apps, plus a daily email.

Code

One Git repository, a folder per connector, tests on every check.

Roadmap

Four phases

Phase 1

Foundation

Vietnam prices, corporate actions, shares and FX; NXW codes; the three zones; core checks.

Done when IMS reads all its inputs from the DMS
Phase 2

Ecosystem

Global data, external indexes, macro series; the nxwdata package; the dashboard.

Done when FUNDMS, INDOBS and VTP drop their own downloads
Phase 3

Research

Fundamentals, ESG and alternative data, point-in-time panels, data dictionary.

Done when CCPR and CCPS back tests run on DMS panels
Phase 4

Scale

Intraday prices, paid feeds where needed, access roles, external data products.

Done when selected datasets are offered to clients
First steps

Where we start

1List

List every download each app does today, with its source and schedule.

2Codes

Agree the NXW instrument code and build INSTRUMENT and ID_MAP for Vietnam.

3Connectors

Move the VTP Yahoo script and the IMS price load into DMS connectors.

4Checks

Write the core checks and the DQ_LOG.

5Switch

Switch IMS to the Curated zone, then the other apps one by one.

Talk to the NXW data team

Clean data in. Confident decisions out.

Contact us
UNDER CONSTRUCTIONDMS is being built: pages, data and features are added step by step.